PipeGraph
0.2
  • API Documentation
  • General examples
PipeGraph
  • Docs »
  • Index

Index

D | F | G | I | N | P | S

D

  • decision_function() (pipegraph.PipeGraph method)

F

  • fit() (pipegraph.PipeGraph method)
  • fit_predict() (pipegraph.PipeGraph method)

G

  • get_params() (pipegraph.PipeGraph method)

I

  • inject() (pipegraph.PipeGraph method)

N

  • named_steps (pipegraph.PipeGraph attribute)

P

  • PipeGraph (class in pipegraph)
  • pipegraph (module)
  • predict() (pipegraph.PipeGraph method)
  • predict_dict() (pipegraph.PipeGraph method)
  • predict_log_proba() (pipegraph.PipeGraph method)
  • predict_proba() (pipegraph.PipeGraph method)

S

  • score() (pipegraph.PipeGraph method)
  • set_params() (pipegraph.PipeGraph method)

© Copyright 2018, The authors

Built with Sphinx using a theme provided by Read the Docs.